| |
Friday, September 10, 2010
|
|
View Document
| Report Title: |
Final Basewide Remedial Investigation/Feasibility
Study (RI/FS), Fort Ord, California (binders 1 through 18) |
| Issued: |
October 1, 1995 |
| Description: |
This RI/FS consists of six volumes. Volume I presents
an overview and background on Fort Ord and summarizes the results of the
Basewide RI/FS. Volume II presents the Remedial Investigations. Volume III
presents the Baseline Human Health Risk Assessment. Volume IV presents the
Baseline Ecological Risk Assessment. Volume V presents the Feasibility Study
and Volume VI presents the response to agency comments received on the draft
final version of the RI/FS. |
| View Report: |
Volume I:
Background and Executive Summary
Volume II:
Remedial Investigation Introduction and Basewide Hydrogeologic Characterization, Text, Tables, and Plates
Remedial Investigation Basewide Hydrogeologic Characterization Appendixes
Remedial Investigation Basewide Surface Water Outfall Investigation
Basewide Storm Drain and Sanitary Sewer Investigation (plates not available in PDF)
Remedial Investigation Sites 2 and 12 - Text, Tables, and Plates
Remedial Investigation Sites 2 and 12 - Appendixes
Remedial Investigation Sites 16 and 17
Remedial Investigation Site 3
Remedial Investigation Site 31
Remedial Investigation Site 39 Text, Tables, and Plates
Remedial Investigation Site 39 Appendixes
Volume III:
Baseline Human Health Risk Assessment
Volume IV:
Baseline Ecological Risk Assessment Text, Tables, and Plates
Baseline Ecological Risk Assessment Appendixes
Baseline Ecological Risk Assessment Appendix K
Volume V:
Feasibility Study Sites 2 and 12, Sites
16 and 17, Site 3
Feasibility Study Site
31, Site 39
Volume VI:
Response to Agency Comments
|
|
|