Document Review
Reference Documents
Reports Under Review

View Document

Report Title: Final Basewide Remedial Investigation/Feasibility Study (RI/FS), Fort Ord, California (binders 1 through 18)
Issued: October 1, 1995
Description: This RI/FS consists of six volumes. Volume I presents an overview and background on Fort Ord and summarizes the results of the Basewide RI/FS. Volume II presents the Remedial Investigations. Volume III presents the Baseline Human Health Risk Assessment. Volume IV presents the Baseline Ecological Risk Assessment. Volume V presents the Feasibility Study and Volume VI presents the response to agency comments received on the draft final version of the RI/FS.
View Report: Volume I:
  • Background and Executive Summary


  • Volume II:
  • Remedial Investigation Introduction and Basewide Hydrogeologic Characterization, Text, Tables, and Plates
  • Remedial Investigation Basewide Hydrogeologic Characterization Appendixes
  • Remedial Investigation Basewide Surface Water Outfall Investigation
  • Basewide Storm Drain and Sanitary Sewer Investigation (plates not available in PDF)
  • Remedial Investigation Sites 2 and 12 - Text, Tables, and Plates
  • Remedial Investigation Sites 2 and 12 - Appendixes
  • Remedial Investigation Sites 16 and 17
  • Remedial Investigation Site 3
  • Remedial Investigation Site 31
  • Remedial Investigation Site 39 Text, Tables, and Plates
  • Remedial Investigation Site 39 Appendixes


  • Volume III:
  • Baseline Human Health Risk Assessment


  • Volume IV:
  • Baseline Ecological Risk Assessment Text, Tables, and Plates
  • Baseline Ecological Risk Assessment Appendixes
  • Baseline Ecological Risk Assessment Appendix K


  • Volume V:
  • Feasibility Study Sites 2 and 12, Sites 16 and 17, Site 3

  • Feasibility Study Site 31, Site 39


  • Volume VI:
  • Response to Agency Comments